24周年

財(cái)稅實(shí)務(wù) 高薪就業(yè) 學(xué)歷教育
APP下載
APP下載新用戶掃碼下載
立享專屬優(yōu)惠

安卓版本:8.7.20 蘋果版本:8.7.20

開發(fā)者:北京正保會(huì)計(jì)科技有限公司

應(yīng)用涉及權(quán)限:查看權(quán)限>

APP隱私政策:查看政策>

HD版本上線:點(diǎn)擊下載>

PM業(yè)績管理練習(xí)題及答案

來源: 正保會(huì)計(jì)網(wǎng)校 編輯:小編 2020/07/09 15:03:06 字體:
1、Alex Co makes specialist computer equipment for the space exploration industry. It recently introduced
a new product, the electroscope. This has to be assembled by hand and the process is very labour
intensive.
A budget was set for the product of 50 hours per unit, based on the time taken to make the first unit.
The first unit was produced in November Actual output and productive labour hours used for the first
six months were as follows:

The management accountant was surprised that the actual production time was below the flexed budget
every month after November. He realised that he had not taken into account the learning curve when he
set the budget.
Required:
(a) Estimate the learning rate for the period. (5 marks)
(b) Determine when the steady state was reached. (5 marks)
【正確答案】 


推薦閱讀:

1、ACCA 2020年7月考試時(shí)間安排

2、考完ACCA可以獲得哪些證書?

3、成為ACCA會(huì)員可以享受哪些福利?

4、會(huì)計(jì)ACCA的就業(yè)前景好不好?

免費(fèi)試聽

限時(shí)免費(fèi)資料

  • 近10年A考匯總

    歷年樣卷

  • 最新官方考試大綱

    考試大綱

  • 各科目專業(yè)詞匯表

    詞匯表

  • ACCA考試報(bào)考指南

    報(bào)考指南

  • ACCA考官文章分享

    考官文章

  • 往年考前串講直播

    思維導(dǎo)圖

回到頂部
折疊
網(wǎng)站地圖

Copyright © 2000 - m.jnjuyue.cn All Rights Reserved. 北京正保會(huì)計(jì)科技有限公司 版權(quán)所有

京B2-20200959 京ICP備20012371號(hào)-7 出版物經(jīng)營許可證 京公網(wǎng)安備 11010802044457號(hào)